A new draft arrives
It is 18:40 and the sponsor's second draft is in. Before you open it, it has been read, compared and calculated.
The situation
A draft comes back with a markup and a covering email. The markup is the sender's account of what changed.
The work starts with finding out whether that account is complete, and it has to be done before anyone can say what the draft means.
What the product does
- 1
It records what arrived
The draft, who sent it and when, and the version it marks up. - 2
It compares the text itself
Word for word with the draft the new one marks up. The sender's markup is not relied on. - 3
It flags what the markup does not show
Wording changed without a tracked change, a settled provision changed again, wording rejected earlier and proposed again. - 4
It calculates the figures again
Every test and basket under the new draft, on the same financial case, so you know which changes move a figure before you read.
Cl. 21.2(b)
A change the markup did not show
The earlier drafts required a reconciliation of each cost-savings addback, signed by the CFO. Sponsor draft 2 has it signed by a director and limits it to addbacks above €5m.
Its markup shows no change to this paragraph. The change was found by comparing the clean text with Lender draft 1, and it arrives in the same draft that raises the cap on those addbacks to 25 per cent.
- Lender draft 1
- Signed by the CFO, for each addback
- Sponsor draft 2
- Signed by a director, addbacks above €5m only
- The sender's markup
- No change shown
What stays with you
- What to do about each change: Fine, Issue or Later.
- The product finds and shows. It does not decide that a change is acceptable.
See it on the example matter.
A walkthrough shows the invented matter on screen, from the draft arriving to the reply.